52–72%

Projected reduction in migration rework

Results

3,600–5,100 hrs

Back with the delivery team each year

Results

0

Discrepancies across 4,562 field-level checks

Results

4.4x–6.1x

Projected annual value against cost

Listen to this article
Before
  • A licensed enterprise ETL platform moved the data, but every change to the product meant an engineer reworked the pipeline. Migration rework ran to around 7,000 hours a year, roughly $840,000.
  • Problems surfaced after the load had run. Around 70% of the time the error a user hit didn’t point to anything they could act on, so it went to the technical team or the file went back to the customer to redo.
  • A load that stopped midway left an unclear picture of what had been written and what hadn’t, and accuracy was confirmed in a separate QA pass at the end.
After
  • The agent reads the field list from the file, so a new field in the product no longer means a new pipeline. Rework is projected to come down to between 1,900 and 3,400 hours a year, roughly $231,000 to $405,000.
  • The whole file is validated before a single record is written. Problems come back named by row, column and field, sorted by who can act on them: customer, admin, user setup, review.
  • An interrupted load resumes where it stopped with no duplicates, and every written field is read back and compared automatically as part of the run.

About the customer

A global risk and compliance software platform running around 1,000 customer data migrations a year across 45 project managers. Every customer they sign has to have their risk and control data loaded before go-live: five levels of hierarchy, cross-linked, arriving as a spreadsheet the end customer fills in themselves. That load is the gate every implementation has to pass through.

The Challenge

A setup that worked was being asked to do more than it was built for
They had already invested in a licensed enterprise ETL platform, and it moved the data. As volume and schema complexity grew, the work around the load became the cost rather than the load itself: roughly 7,000 hours of rework a year, or about $840,000.

Errors surfaced after the run, not before it
Around 70% of the time a user hit an error mid-process, the message didn’t point to anything they could act on. It went to the technical team, or the whole file went back to the customer to redo. Either way the migration paused, and the project manager waited.

Loads that stopped halfway had to be reconciled by hand
Their API is rate-limited, so on a large file the pipeline could stop mid-run with no clear record of what had been written. Someone had to work that out manually before anyone could restart.

Every product change meant reworking the pipeline
Each new field in the platform meant an engineer reworked the ETL flow. Professional services leadership described it as a standing tax on the team, paid out of the same capacity that was meant to go to customers.

The Solution

Project managers see problems before anything is loaded
The project manager uploads the spreadsheet and works with the agent in plain English. Before writing anything, the agent checks the whole file against the live system and shows what it will create and what needs attention. The PM then chooses to load everything, load only the clean rows, or stop and fix the file first.

Each fix goes straight to the person who can make it
Instead of one error file for someone to decipher, problems come back named by row, column and field, grouped by owner: what the customer needs to correct, what an admin can resolve, what belongs in user setup, and what needs a review. PMs can send each item to the right person without triaging it themselves.

Interrupted loads pick up where they stopped
When a run is interrupted, the agent resumes from the last written record with no duplicates. Nobody reconciles the state by hand or restarts a large file from the top.

Product changes stay with the product team
The agent reads the field list from the file rather than from a hardcoded mapping, so adding a field to the platform no longer pulls an engineer into the migration path.

Accuracy is checked during the run
Every written field is read back and compared automatically, so the team doesn’t wait for a separate QA pass once the load is done.

The Impact

Migration rework projected to drop 52% to 72%
With the agent in place, rework would come down from around 7,000 hours a year to between 1,900 and 3,400, a cost of roughly $231,000 to $405,000 instead of about $840,000. That’s 3,600 to 5,100 hours a year back with the delivery team.

Accuracy proven on their own data
The team ran a full migration through the agent and checked it independently against their existing ETL tool: 737 records with the full hierarchy and cross-links intact, 4,562 field-level comparisons in their own QA, and zero discrepancies.

Errors caught before the load, not after
They also tested the agent with a file containing six deliberate errors: a duplicated column, a blank identifier, an invalid ID, and records sharing an ID while disagreeing on their contents. The agent found five of the six before writing anything, named the row and column for each, and wouldn’t load until they were fixed.

A return that starts in month one
Projected annual value is $435,000 to $609,000 against an annual cost of about $100,000. That’s 4.4x to 6.1x the cost from the month it goes live.